Paving Contractors of Houston logo

Parking Lot Paving

Parking Lot Paving done right in Houston

Houston parking lots take a beating. We rebuild them with a focus on safe access, clear communication, and durable transitions at entrances and dumpster pads.

Why teams choose this service

Phased logistics

We create color-coded phasing maps and coordinate with tenants so customers always have a place to park.

Full depth rehab

When needed, we remove existing pavement, stabilize subgrade, and rebuild from the base up.

Striping included

ADA stalls, fire lanes, and custom stencils delivered within 24 hours of paving.

Our repeatable process

  1. Step 1

    Site evaluation

    Survey potholes, cracking, drainage, and trip hazards. Document utilities and coordinate traffic control.

  2. Step 2

    Demolition

    Mill or remove failed asphalt, haul spoils, and prep the base for proof-rolling.

  3. Step 3

    Base repair

    Install limestone base, recompact, and ensure positive drainage to storm structures.

  4. Step 4

    Paving & compaction

    Place asphalt or concrete per design thickness and compact to 95% density.

  5. Step 5

    Striping & turnover

    Stripe, install wheel stops, clean the site, and present closeout photos.

Recent projects

After photo of newly paved striped asphalt parking lot in Katy

Retail Center Lot Rebuild – Katy

Full-depth asphalt replacement with night crews and striping for a busy retail center on Fry Road.

Frequently asked questions

How do you keep the business open during paving?

We phase work in sections, post signage, and coordinate with property managers daily to keep key entrances open.

Can you add new ADA parking?

Yes. We restripe per current Texas Accessibility Standards and install truncated dome mats where required.

Will customers track asphalt indoors?

We broom sweep and power blow walkways before opening, and recommend mat service during the first week.

Do you offer maintenance plans?

We schedule annual inspections and recommend sealcoating every 3 to 4 years to extend pavement life.

Can you install lighting conduit or drainage during paving?

We coordinate with electrical and utility trades to place conduit or adjust drains while the pavement is open.

What about dumpster pads and loading docks?

We reinforce dumpster pads with 8-inch concrete and doweled connections to the asphalt.

Call Now Free Quote