Paving Contractors of Houston logo

Asphalt Paving

Asphalt Paving done right in Houston

We design and install dense-graded asphalt pavements that hold up to Houston heat, truck traffic, and heavy rain. Every project starts with a compaction test and ends with a clean job site ready for striping.

Why teams choose this service

Houston-ready mix designs

We specify PG 70-22 or higher binders with air void targets tuned for Gulf Coast weather swings.

Tight transitions

Smooth tie-ins at sidewalks and drain inlets keep water moving and eliminate trip hazards.

Clean turnover

Night and weekend crews keep businesses open. We sweep and haul debris before barricades come down.

Our repeatable process

  1. Step 1

    Site walk and elevations

    Same-week visit to measure slopes, verify utilities, and document drainage pinch points.

  2. Step 2

    Subgrade proofing

    Stabilize soft spots with crushed limestone, install geotextile as needed, and compact to spec.

  3. Step 3

    Base installation

    Place and laser-grade new Texas DOT Type A base rock, compacting in lifts for longevity.

  4. Step 4

    Asphalt placement

    Lay asphalt with a Blaw-Knox paver, maintain joint temperature, and roll for a tight mat.

  5. Step 5

    Punch list and striping

    Walk the punch list with ownership, stripe immediately or stage crews within 24 hours.

Recent projects

Newly paved hospital emergency loop with striping in Houston Medical Center

Hospital Emergency Loop – Medical Center

Rebuilt ambulance loop with high-traction asphalt, ADA crosswalks, and traffic control planning.

Frequently asked questions

How fast can you start an asphalt paving project?

We offer free same-week site visits. After contract, most asphalt projects break ground in 10 to 14 days depending on material lead times.

Do you handle traffic control during paving?

Yes. We coordinate barricades, flaggers, and detour signage for commercial lots and private roadways when requested.

What thickness do you recommend for parking lots?

Typical commercial lots in Houston receive 2 inches of surface course over 6 inches of stabilized base. Truck courts may need thicker sections.

Can you phase the work to keep businesses open?

We stage paving in sections, offer night and weekend crews, and keep emergency access open throughout the project.

How long should we stay off the new asphalt?

Foot traffic is fine within a few hours. We recommend 24 hours before reopening to vehicles unless otherwise noted.

Do you provide warranties?

Yes. Every asphalt paving project includes a 5-year workmanship warranty with annual check-ins available.

Call Now Free Quote