
HOA Street Overlay – The Woodlands
Milled and resurfaced three miles of private HOA streets with resident communication plan.
Milling & Resurfacing
Our Wirtgen milling crews cut transitions cleanly and keep your doorways accessible. Overlays are installed with attention to slope, compaction, and final ride quality.
Why teams choose this service
Smart phasing
We mill and pave in the same shift when possible, preventing prolonged rough surfaces.
Drainage corrections
We mill deeper where water ponds and feather cold joints for smooth transitions.
Clean haul-off
Milled material is loaded directly into trucks and recycled at Houston batch plants.
Our repeatable process
Assessment
Check rut depth, existing thickness, and drainage to determine overlay strategy.
Milling
Use precision milling to remove deteriorated asphalt and establish new profile.
Cleaning
Power broom and tack coat the milled surface for strong adhesion.
Overlay
Install hot-mix asphalt overlay, compact in lifts, and monitor temperatures.
Final rolling
Perform finish rolling, adjust utility lids, and reopen lanes with fresh striping.
Recent projects
Milled and resurfaced three miles of private HOA streets with resident communication plan.
Milled and resurfaced shopping plaza parking with traffic control and same-night reopen strategy.
Frequently asked questions
How deep do you mill before resurfacing?
Most overlays receive 1 to 2 inches of milling, deeper where rutting or drainage requires.
Will milling create a mess?
We broom constantly, use vacuum trucks when needed, and haul material off-site immediately.
Can we stay open during milling?
Yes. We phase work lanes at a time and maintain clear signage for customers.
How long before striping can go down?
We can restripe the next day or apply temporary markings immediately.
Does an overlay add height to curbs?
We adjust catch basins and feather tie-ins to maintain proper curb reveal.
Do you warranty overlays?
Yes. Overlays include a 3-year workmanship warranty with optional maintenance plans.